Elkhorn Rural Public Power District
ERPPD enlisted SunVest Solar to build, own, and operate three community solar gardens with a combined capacity of 6.5 megawatts.
ERPPD enlisted SunVest Solar to build, own, and operate three community solar gardens with a combined capacity of 6.5 megawatts.
Forest County Potawatomi began with a major investment at their Milwaukee Casino in 2014. This installation was completed simultaneously with roof and ground mount installations in Crandon, WI.
Over ninety-eight sites received solar installations in 2018. The total project size was 362 kw. A great amount of coordination is required to complete this many sites within the project time window.
St. Dennis Parish has made a significant commitment to sustainability. Through lighting retrofits and HVAC upgrades, the Parish has reduced their carbon footprint.
SunVest Solar was contracted to design and install a 40 panel, 12.8 kW solar electric system on Vincent High School in Milwaukee.
SunVest Solar installed a 37 kW (DC) PV system for St. Paul’s Lutheran Church in East Northport, NY. The system was completed in 2016.
This 53 kW, ballasted roof mounted system was completed in 2015. 177 panels are held in place by a Unirac 10 degree pitched racking system.
In 2016 St. Dennis Church purchased a 66 panel, 21 kW (DC) array. The system was installed on the garage/storage facility on the north end of the property.
Attic Angel senior living facility is now graced by a 93 kW solar array. Two roofs – a south facing and a west facing – now feature flush-mounted arrays.
Escuela Verde is a charter school in the Milwaukee School District. The array at Escuela Verde is comprised of donated panels from a local manufacturer.
NATIONAL HEADQUARTERS
N27 W24025 Paul Ct. | Suite 100
Pewaukee, WI 53072
Phone: (262) 547-1200
BRANCH OFFICES
Northeast: (262) 547-1200
Illinois:(262) 547-1200
Madison, WI
Geneva, IL
Wood Dale, IL
Oakpark, IL
Highland, IL
Newark, NJ
New York, NY
Philadelphia, PA